Draft Meghalaya State Electricity Regulatory Commission (Grid Interactive Distributed Renewable Energy Sources) (2 of 2026) (First Amendment) Regulations, 2026
Added to NoticeTap
Details updated
Official publication date not provided
the Meghalaya State Electricity Regulatory Commission, hereby proposes to amend the Meghalaya State Electricity Regulatory Commission (Grid Interactive Distributed Renewable Energy Sources) (2 of 2026) Regulations, 2026 (herein referred to as the “Principal Regulations”) namely;
Important to know
The minimum capacity of DRES that can be set up under net metering mechanism shall be 1 kW, while the maximum capacity shall not exceed the sanctioned load or contract demand of the prosumer or 500 kW, whichever is lower: Provided that in the event a prosumer had received approval of the DISCOM under the provisions of the Meghalaya State Electricity Regulatory Commission (Rooftop Solar Grid Interactive Systems Based on Net Metering) (First Amendment) Regulations, 2015 (1 of 2025), prior to the Notification of the Meghalaya State Electricity Regulatory Commission (Grid Interactive Distributed Renewable Energy Sources) (2 of 2026) Regulations, 2026 for a capacity beyond 500 KW, the capacity as approved shall be permitted, with or without battery storage.
Amendment, extension or revised notice. Read it alongside the original announcement.
Source & history
Prepared automatically from the official source; AI may help select excerpts. Individual human review is not implied. Check the original for complete details.
Source last read: 8 Oct 2026